Hi
I am looking at using some fittings on central heating but will need some Soldered joints above the floor boards, can anyone advise me how far down the pipe it will get hot (i am not doing the soldering) before it could be a risk to a speedfit fitting,
I have 3.5 inches between where the joint is going to be done and the speed fit fitting, thinking can put old very cold wet rags below where the joint is being done and the speedfit elbow to keep the pipe for getting to hot
I am looking at using some fittings on central heating but will need some Soldered joints above the floor boards, can anyone advise me how far down the pipe it will get hot (i am not doing the soldering) before it could be a risk to a speedfit fitting,
I have 3.5 inches between where the joint is going to be done and the speed fit fitting, thinking can put old very cold wet rags below where the joint is being done and the speedfit elbow to keep the pipe for getting to hot