Hi all. The dig will be 1m deep x 8.2m long x 450mm wide. No pipe work or anything to worry about, a straight forward dig and fill. Concrete required will be 700mm x 8.2m x 450mm. All crap from the hole to be taken away. How much would I be looking at chaps