I need to mix 2.5 cubic metres concrete using a 3:2:1 mix
I plan to order 2 tonnes ballast(correction-gravel), 1.5 tonne sand( slightly excess) and 24 X 25kg bags Portland cement.
Does this sound approximately correct.
I dont mind if I over order the ballast and sand