I am about to knock down 5 internal breez brick walls and re-build using
wood ok know what i am doing there..however.. the concrete floor is cracked and will be when i move the walls and the rest of the floor area has previously had a self leveling compound on it and its rubbish(cracked , unevan and breaks off in your hand)
I have been told to take up the screed to expose the plastic DPM then lay
2x2 battons down and insulate cover with 22m tongue and groove chipboard then put my flooring cover down
'A Floating Floor' is this a good option or what should i do
The battons will only be laid not nailed so DPM will be in tacted
any advice
cheers
Ducati
Ps anyone not busy next wek fancy knocking down walls as anger management let me know lol
wood ok know what i am doing there..however.. the concrete floor is cracked and will be when i move the walls and the rest of the floor area has previously had a self leveling compound on it and its rubbish(cracked , unevan and breaks off in your hand)
I have been told to take up the screed to expose the plastic DPM then lay
2x2 battons down and insulate cover with 22m tongue and groove chipboard then put my flooring cover down
'A Floating Floor' is this a good option or what should i do
The battons will only be laid not nailed so DPM will be in tacted
any advice
cheers
Ducati
Ps anyone not busy next wek fancy knocking down walls as anger management let me know lol