I have got a electricticain to install 5 new storage heaters to replace the ones that don't work back in january Still not in said he had to fit a new rcd board to comply with uk standards since then the below has happend but still no sign that any work has been done anywhere! would I notice anything with what he's told me he has done which is not a lot for 2 months ?
• 19th Jan cancelled re arranged 25th Jan
• 25th Jan did not show I had to chase and then rearranged to 2nd Feb.
• 1st Feb. rearranged to the 9th Feb.
• 9th Feb. had to rearrange to the 16th Feb. but will have a team to move fast and get the job done
• 16th Feb. rearranged to 17th Feb. but has upgraded the heaters
• 17th Feb. tuned up said measured up, done prep work testing and small circuit adjustments to start installation on 23rd Feb.
• 22nd made adjustments to lighting circuit inside panel
• 23rd did not show but went to get equipment for lighting circuit
• 24th found a smouldered wire done a temp repair on other cables that are worn and said will do a partial re wire
• 28th stared on the internal upgrade of lighting circuit
• 1st march done test on lighting circuit and need to upgrade loop completion date put back a week said found another 2 cables that where smouldered but making good progress
• 2nd march will take out lighting circuit and re do as all out of line install new mains board then fit heaters
• 8th march still ok to finish end of the week
• 9th march now needs to re wire downstairs lights as connections all inter linked.
• 19th Jan cancelled re arranged 25th Jan
• 25th Jan did not show I had to chase and then rearranged to 2nd Feb.
• 1st Feb. rearranged to the 9th Feb.
• 9th Feb. had to rearrange to the 16th Feb. but will have a team to move fast and get the job done
• 16th Feb. rearranged to 17th Feb. but has upgraded the heaters
• 17th Feb. tuned up said measured up, done prep work testing and small circuit adjustments to start installation on 23rd Feb.
• 22nd made adjustments to lighting circuit inside panel
• 23rd did not show but went to get equipment for lighting circuit
• 24th found a smouldered wire done a temp repair on other cables that are worn and said will do a partial re wire
• 28th stared on the internal upgrade of lighting circuit
• 1st march done test on lighting circuit and need to upgrade loop completion date put back a week said found another 2 cables that where smouldered but making good progress
• 2nd march will take out lighting circuit and re do as all out of line install new mains board then fit heaters
• 8th march still ok to finish end of the week
• 9th march now needs to re wire downstairs lights as connections all inter linked.