I'm making a base for an 8x6 shed out of some spare 3x2 slabs. They're flipping heavy. I was hoping to tackle it on my own but I don't fancy putting my back out. Is help essential? Recommended methods for moving the slabs around and laying them down without injury would be much appreciated!