Hi. I have built a lean-to onto a peddledash over stone wall on an old Scottish house. The lean-to is fibre slated. Put 300mm lead on the slate bent up the wall 90mm so 210mm over slates. I cut a 50mm deep slot for flashing into the p/d - mastiked and inserted 150mm lead flashing and bent this down over the upstand lead. Then masticked the slot completely.
Now I am getting wet down the p/d wall inside the lean-to and can't see how this is happening.
Have I done something wrong?
Any ideas?