Hi,
I'm renovating a back to back terrace and want to move the bathroom to create an extra bedroom.
This means the new bathroom will be at the back of the house. I plan to run the soil pipe from the back of the house (about 4.5 metre) between the joists, out of the front, 90 degree bend then about 2 metres to the current vertical soil stack.
My measurements are only approx at the minute but the total run from the toilet to the vertical stack may be around 6.5 metres - will it be a problem if I go over the 6m limit. Could I fit an AAV internally to overcome the issue?
I also plan to connect the sink and bath waste into the soil pipe. Should I make this connection under the floor or extend the soil pipe closer to the bath, then connect above floor level and box in?
Thanks
I'm renovating a back to back terrace and want to move the bathroom to create an extra bedroom.
This means the new bathroom will be at the back of the house. I plan to run the soil pipe from the back of the house (about 4.5 metre) between the joists, out of the front, 90 degree bend then about 2 metres to the current vertical soil stack.
My measurements are only approx at the minute but the total run from the toilet to the vertical stack may be around 6.5 metres - will it be a problem if I go over the 6m limit. Could I fit an AAV internally to overcome the issue?
I also plan to connect the sink and bath waste into the soil pipe. Should I make this connection under the floor or extend the soil pipe closer to the bath, then connect above floor level and box in?
Thanks