Hi, it's doing my head in. I've been let down by 2 people now, the first one said he'd be with me x date but did not, then he said it would be the end of the following week and still no show.
Went on to check a trade and found someone else. he came round the other day to look at the job. the poor chap was hobbling around and said he was going in for a hip operation - so that's him out of action for a while.
meanwhile i have had the new kit delivered and it's been in my spare room for over a month now. It's very frustrating putting up with a cr@p bathroom as i stripped all the tiles and flooring so there's only the shyte bath sink and loo in there atm. why is it so difficult to get someone to fit it?
I found it easy and a pleasure to have the window guys and sparky here recently with no mucking about but the bathroom grrrrrrrrrrrr
rant over, any suggestions please?
Went on to check a trade and found someone else. he came round the other day to look at the job. the poor chap was hobbling around and said he was going in for a hip operation - so that's him out of action for a while.
meanwhile i have had the new kit delivered and it's been in my spare room for over a month now. It's very frustrating putting up with a cr@p bathroom as i stripped all the tiles and flooring so there's only the shyte bath sink and loo in there atm. why is it so difficult to get someone to fit it?
I found it easy and a pleasure to have the window guys and sparky here recently with no mucking about but the bathroom grrrrrrrrrrrr
rant over, any suggestions please?