I currently have a flat roof that is 38 years old and needs to be stripped down and re-decked (inc firings.)
I have had 4 quotes done but need advice on the roofer that I have chosen!
All 3 roofers have quoted that the job will take 3-4 days to complete...... however the roofer that i have chosen has quoted to do the job in 1 day!
I would like to know if it is possible to strip off the old decking, firings and felt, lay new firings, new decking and a 2 layers of touch-on felt within a day (around 8 to 10hours!)
Do you need to allow 24 hours for the underlay to set before laying the top cap sheet? (or is it better to lay the top cap sheet under newly laid underlay?)
I am hoping if it was done within 10 hours, that the underlay and top cap sheet won’t be defected in anyway.
Has anyone laid new decking and a 2 layer felt system within a day?
I’ve attached a diagrammed of my roof with measurements and what I need (and don’t need!)
Could you do this within a day?
Thanks in advance.
I have had 4 quotes done but need advice on the roofer that I have chosen!
All 3 roofers have quoted that the job will take 3-4 days to complete...... however the roofer that i have chosen has quoted to do the job in 1 day!
I would like to know if it is possible to strip off the old decking, firings and felt, lay new firings, new decking and a 2 layers of touch-on felt within a day (around 8 to 10hours!)
Do you need to allow 24 hours for the underlay to set before laying the top cap sheet? (or is it better to lay the top cap sheet under newly laid underlay?)
I am hoping if it was done within 10 hours, that the underlay and top cap sheet won’t be defected in anyway.
Has anyone laid new decking and a 2 layer felt system within a day?
I’ve attached a diagrammed of my roof with measurements and what I need (and don’t need!)
Could you do this within a day?
Thanks in advance.