Hi folks.
We're after a bit of advice on how when using a plate compactor, how much it does compress aggregate?
Info:
We are laying a new patio at the side of sleeper raised beds, and are currently digging down ready to install a sub-base of about 3 inch. We will be using a mortar bed of 2 inch, with 1 inch slate slabs for the surface.
So, if for example we want a 3 inch sub-base, do we need to tip in 3.5 or 4 inch of MOT type 1 aggregate, which when compacted drops to 3 inch? Can't see to find any information on this.
Thanks.