Hello all,
I'm in the process of redoing the bathroom and have started to remove the tiles from the wall, the previous owner has tiled over tiles so it's taking a little longer than planned but I was wondering if you could answer this question.
Where the shower is going is a stud wall so I'm going to remove the old plaster & plasterboard and re board it using moisture boards.
The wall which runs along side this is an outside wall, when I've removed the tiles from this it's taken some areas back to the breeze block, my question is, can I just dot and dab this with plasterboard / moisture board or will it need taking back to the breeze block fully and then plastering over that?
If you need pictures let me know.
Thanks,
Scott
I'm in the process of redoing the bathroom and have started to remove the tiles from the wall, the previous owner has tiled over tiles so it's taking a little longer than planned but I was wondering if you could answer this question.
Where the shower is going is a stud wall so I'm going to remove the old plaster & plasterboard and re board it using moisture boards.
The wall which runs along side this is an outside wall, when I've removed the tiles from this it's taken some areas back to the breeze block, my question is, can I just dot and dab this with plasterboard / moisture board or will it need taking back to the breeze block fully and then plastering over that?
If you need pictures let me know.
Thanks,
Scott