Hi all,
My livingroom and dinning room have large sliding doors between them. I have taken these out and am going to build a stud frame in place. The studwork will fill most of the wall with about 300mm either side and above left. Do I:
a) plasterboard the studwork and get it plastered. I concerened that over time the edges connecting to the existing wall will crack
b) plasterboard the studwork and then board over the full wall (dot and dab) and get it plastered?
any other ideas appreciated.
My livingroom and dinning room have large sliding doors between them. I have taken these out and am going to build a stud frame in place. The studwork will fill most of the wall with about 300mm either side and above left. Do I:
a) plasterboard the studwork and get it plastered. I concerened that over time the edges connecting to the existing wall will crack
b) plasterboard the studwork and then board over the full wall (dot and dab) and get it plastered?
any other ideas appreciated.