Hi,
I have posted a couple of times regarding this and still not sure what we should do. Below is an attached image of our floor plan, the stove boiler in the living room will be providing hot water and heating, the space at the side of the fluepip is hopefully going to house the manifolds for the radiators.
Currently just the downstairs will be completed and the upstairs at a later date.
What we are unsure of is whether to have copper or plastic? Copper to radiator manifold and then plastic from then on? Or just copper throughout?
There is just the 6 radiators down stairs. The house is a suspended floor with i beam engineered joists that should have holes pre drilled ready to pop out should we want too.
Also, what are your thoughts on the Soil pipe? I dont really want it going under the foundations, you think we should take it out the opposite direction and along the side toward the kitchen and then an inspection chaimber there and then to the sewage treatment plant?
Any advice would be great, its a wood pellet boiler stove.
img @ http://www.nbriggs.co.uk/floorplan.JPG
Cheers.
Danny B
I have posted a couple of times regarding this and still not sure what we should do. Below is an attached image of our floor plan, the stove boiler in the living room will be providing hot water and heating, the space at the side of the fluepip is hopefully going to house the manifolds for the radiators.
Currently just the downstairs will be completed and the upstairs at a later date.
What we are unsure of is whether to have copper or plastic? Copper to radiator manifold and then plastic from then on? Or just copper throughout?
There is just the 6 radiators down stairs. The house is a suspended floor with i beam engineered joists that should have holes pre drilled ready to pop out should we want too.
Also, what are your thoughts on the Soil pipe? I dont really want it going under the foundations, you think we should take it out the opposite direction and along the side toward the kitchen and then an inspection chaimber there and then to the sewage treatment plant?
Any advice would be great, its a wood pellet boiler stove.
img @ http://www.nbriggs.co.uk/floorplan.JPG
Cheers.
Danny B