Hi
looking at the installation instructions for one of these it states that the inhibitor should be placed before the Boiler. Is there any reason it cant be installed (or has anyone tried this) just after the main stop cock therefore protecting all the plumbing from lime-scale?
Thanks
looking at the installation instructions for one of these it states that the inhibitor should be placed before the Boiler. Is there any reason it cant be installed (or has anyone tried this) just after the main stop cock therefore protecting all the plumbing from lime-scale?
Thanks