Hi folks
I have got my floorboards up at the moment and someone mentioned I should put in a wire from the boiler site to the pump site in readiness for when I have to replace my old boiler with a condensing one (probably a year or so).
Could anyone advise whether this is good advice and if so what type of wire would I fit.
Cheers for any thoughts
Sam
I have got my floorboards up at the moment and someone mentioned I should put in a wire from the boiler site to the pump site in readiness for when I have to replace my old boiler with a condensing one (probably a year or so).
Could anyone advise whether this is good advice and if so what type of wire would I fit.
Cheers for any thoughts
Sam