Hi,
My plasterer wants the pipes removed from the wall (except for the incoming mains) so he can apply sand-cement render ahead of skim. Just the pipes on the left-hand wall.
He'll still need water for knocking up his mix.
I'm thinking to cut and cap the pipes just in the corner and above the incoming mains. Then stick a flexi-connection above the incoming mains.
Cheers