The only way I can see to get CH into new single storey extension without digging up lovely floors is to run flow & return pipes direct from downstairs boiler cupboard (across cavity wall) a 90 bend and then through a few metres of ceiling.
It will mean drilling through all joists and part of the ceiling is a flat roof so I'll need to consider insulating the pipes as well.
Access will be tricky so thinking to use plastic pipes (Hep?). Any advice most welcome.
It will mean drilling through all joists and part of the ceiling is a flat roof so I'll need to consider insulating the pipes as well.
Access will be tricky so thinking to use plastic pipes (Hep?). Any advice most welcome.