I have a problem re the waste for shower tray lines up exactly on a floor joist. i understand the max cut in the joist allowed is 0.25% of the joist diameter and this will be insufficient.
it is not really an option to raise the level as the waste depth is large.(fast flow system)
Any advice welcomed how to get round this problem...
im not able to consider moving the tray position due to limited bathroom space