Hi everyone,

I've got a section of floor that I want to build stud work on top of (see picture).


At the moment the hole is full of dirt and grime that I'm going to take out, and I planned on filling the hole with cement - sand - water mix

Just wanted to get some advice on ratios to use and how long to leave until I can build on studwork. I've seen the self leveling compound but not sure if this is suitable? I'd prefer to use what I have available as it will save me buying more materials
 