- Joined
- 31 Aug 2013
- Messages
- 261
- Reaction score
- 1
- Country
Hi everyone,
I've got a section of floor that I want to build stud work on top of (see picture).
At the moment the hole is full of dirt and grime that I'm going to take out, and I planned on filling the hole with cement - sand - water mix
Just wanted to get some advice on ratios to use and how long to leave until I can build on studwork. I've seen the self leveling compound but not sure if this is suitable? I'd prefer to use what I have available as it will save me buying more materials
I've got a section of floor that I want to build stud work on top of (see picture).
At the moment the hole is full of dirt and grime that I'm going to take out, and I planned on filling the hole with cement - sand - water mix
Just wanted to get some advice on ratios to use and how long to leave until I can build on studwork. I've seen the self leveling compound but not sure if this is suitable? I'd prefer to use what I have available as it will save me buying more materials