is it possible to split up a skirting board paint job by doing 2 coats coloured varnish one side and a few hours later doing the next side or the next day. Can this be done without any colour differential on sides done per day as long as there done soon enough to one another? Im just wondering as I can only remove so much from the room at a time and cant do the entire room in one go.