i am tiling above my worktops with 4 x 4 tiles.i have checked my worktop and it is not 100% level so i dont just want to sit then on it or they will slope. i am using a worktop bead as my walls was not perfect either how do i go about starting.what i mean is getting a straigh line then i will be fine?