- Joined
- 22 Jan 2007
- Messages
- 8,313
- Reaction score
- 4,134
- Country
hey all, gonna be getting the bathroom tiled soon (by a pro) was just wandering the best way of doing it?
Ill be fitting the shower/tray/toilet etc, but should i fit these all before the tiler comes or do teh tiles go down first then fit the sink and toiler on top?
cheers guys
Ill be fitting the shower/tray/toilet etc, but should i fit these all before the tiler comes or do teh tiles go down first then fit the sink and toiler on top?
cheers guys