Hi all,
I'm refurbishing a house and have had my gas and water shut off at the mains for a couple of months now.
I've just finished running all my CH Pipework and want to test it before it gets covered over with flooring or plaster, so I've linked some spare pipe across all the flow/returns to complete the circuit as a temporary solution so that the system can be ran for a bit to check for leaks etc.
As I said, the water and gas have been off since at least October and the boiler has been switched off at the mains (Ideal Standard Combi). I'm planning to do the following;
-turn on boiler at mains
-turn gas/water on at mains
-open valves on boiler
-set system to operate
Is this ok, or are there any other things I should be doing?
I'm refurbishing a house and have had my gas and water shut off at the mains for a couple of months now.
I've just finished running all my CH Pipework and want to test it before it gets covered over with flooring or plaster, so I've linked some spare pipe across all the flow/returns to complete the circuit as a temporary solution so that the system can be ran for a bit to check for leaks etc.
As I said, the water and gas have been off since at least October and the boiler has been switched off at the mains (Ideal Standard Combi). I'm planning to do the following;
-turn on boiler at mains
-turn gas/water on at mains
-open valves on boiler
-set system to operate
Is this ok, or are there any other things I should be doing?