- Joined
- 21 Apr 2022
- Messages
- 4
- Reaction score
- 1
- Country
Hi guys
Can anyone advise please ?
Upstairs Downlight run has several more additions across landing extension !
Two way switch controlling at foot of stairs and top! Due to the extension to other rooms customer wants third switch at end of new run ! Obviously an intermediate required to replace the two way at top of stairs and an two way at end of run to extension ! Question is .. I’ve put a three core strapper between top of stairs two way switch and the location of the two way at end of corridor , but have I been a div because the current two way at top of stairs allready has a strapper down to the switch at foot of stairs ! Suppose what I’m asking is do I have to rip it back out and reconfigure Much apreciate solution ! Thanks
Can anyone advise please ?
Upstairs Downlight run has several more additions across landing extension !
Two way switch controlling at foot of stairs and top! Due to the extension to other rooms customer wants third switch at end of new run ! Obviously an intermediate required to replace the two way at top of stairs and an two way at end of run to extension ! Question is .. I’ve put a three core strapper between top of stairs two way switch and the location of the two way at end of corridor , but have I been a div because the current two way at top of stairs allready has a strapper down to the switch at foot of stairs ! Suppose what I’m asking is do I have to rip it back out and reconfigure Much apreciate solution ! Thanks