I recently had an extension built by a building company but not to a finished standard. They did all the electrics, ventilation and hidden plumbing and I've got to put the doors in, add handrails to the stairs, put radiators on and fit the bathroom.
The council building control have done two inspections during the build and the last one left is the final sign off.
What do I need to get done before calling them in for that? Do I need the radiators on and working for example?
The council building control have done two inspections during the build and the last one left is the final sign off.
What do I need to get done before calling them in for that? Do I need the radiators on and working for example?