Hi All,
I had some work done by an electrician to commission an existing buried SWA cable to provide a 20 amp supply for a hot tub.
Do do this he changed the existing MCB in the main CU to 20 amp which feeds a small CU in the garage, where he connected a new 20 amp MCB, then ran T&E to the terminated SWA in the garage, and put an isolator on the other end in the garage.
All meggered and tested fine.
BUT, he hasn't given me any paperwork! He said he could if the hot tub company requested it, but it would cost extra as it involves more testing. Should I have been given something? Part P cert, or even just minor works?
I'm not sure if this is notifiable as no new circuit was taken from the main CU, and the garden is no longer notifiable.
Should I have received anything more than an invoice?!
Cheers,
AP
I had some work done by an electrician to commission an existing buried SWA cable to provide a 20 amp supply for a hot tub.
Do do this he changed the existing MCB in the main CU to 20 amp which feeds a small CU in the garage, where he connected a new 20 amp MCB, then ran T&E to the terminated SWA in the garage, and put an isolator on the other end in the garage.
All meggered and tested fine.
BUT, he hasn't given me any paperwork! He said he could if the hot tub company requested it, but it would cost extra as it involves more testing. Should I have been given something? Part P cert, or even just minor works?
I'm not sure if this is notifiable as no new circuit was taken from the main CU, and the garden is no longer notifiable.
Should I have received anything more than an invoice?!
Cheers,
AP