hi all, hopefully someone can help me to save me guessing and hoping for the best!
I'm going to lay tile loc on the mother in laws kitchen floor, but first I have to raise half of it to equal the highest point which is existing ceramic tiles.
I was going to use leveling compound to raise it the required 15-18mm or so.
Q1 - would I have to do that in a couple of goes to get that thickness?
and
Q2 - will it need weeks and weeks to dry or if i do it within a day or two, will it ruin the tile loc?
hope someone can help?
Jim.
I'm going to lay tile loc on the mother in laws kitchen floor, but first I have to raise half of it to equal the highest point which is existing ceramic tiles.
I was going to use leveling compound to raise it the required 15-18mm or so.
Q1 - would I have to do that in a couple of goes to get that thickness?
and
Q2 - will it need weeks and weeks to dry or if i do it within a day or two, will it ruin the tile loc?
hope someone can help?
Jim.