- Joined
- 2 Apr 2005
- Messages
- 14
- Reaction score
- 0
- Country
i want to install a shower, i have a combie boiler that is in the loft above the bathroom. Would it be easier to run a connection for the shower from the combie and run down, or should i install a tank up in the loft and use that for the cold feed. Any help will be appreciated.