    Gloves

    Used all sorts over the years but tend to always just buy these nowadays, slightly insulated, comfortable and cheap so can treat them as disposable, got several pairs at any one time
  2. 2

    Bathroom ceiling build up with cold void above

    Top of rafters bear onto party wall I guess, for the roof spread question…
  3. 2

    How to prep for dot and dab

    Dabbing compound will stick to anything, just damp it down a bit, deffo doesn’t need thistle bond-it
  4. 2

    PTFE tape for compression fitting

    Think I’ve ptfe’d an olive one time in thousands of compression fittings, to get out of a dodgy situation where the olive was over tightened/knackered, it did work tbf. Never ever on the threads. For years I just did them dry, nowadays I like a little dab of paste, stops that creaking when you...
  5. 2

    PTFE tape for compression fitting

    No, use a bit of jointing compound on the olive. Or will also be fine without using anything
  6. 2

    Insulation advice needed

    I’d do something like pinning 50mm PIR behind a 2x2 frame with a load more PIR in between them, then finish it with ply then you can use it as a garage wall for all the shelves, fixings etc and end up with pretty much 100mm insulation which should make a big difference…
  7. 2

    Insulating solid wall and bay window

    Assumed you meant the hex section was also solid, if it’s studwork then yes agree celotex in between etc as above …
  8. 2

    Insulating solid wall and bay window

    I’d remove, insulate and replace the ceiling section assuming it’s currently uninsulated flat/pitched roof above it. Put as much loft insulation as poss up there if space allows. You’re essentially adding 40mm of EPS/PIR to the walls which is going to help but probably not work wonders in the...
  9. 2

    Advice required regarding tanking Jackoboard shower niche

    Had the exact same issue although not using the same gear… do what you can then just tank the heck out of it and do a good job tiling and silicone all the internal corners. Dry as a bone a year later and backs into an airing cupboard so can be checked any time…
  10. 2

    DPC torn

    I’d imagine with a bit of care you could chase out and re-insert it, and gun some sealant in to help hold it. You’ll presumably already have a dpc on that course, so avoid cutting into that, go a few mm above it ? Then tape the new bit to the existing
  11. 2

    Bathroom ceiling build up with cold void above

    here he goes… Yes, I know what a vapour barrier is. But remember, the vast majority of non-vaulted ceilings with a loft above, don’t involve one by design and are fine. So to say it’s essential in this case is slightly inaccurate, as long as the loft insulation and ceiling boarding/lighting...
  12. 2

    Bathroom ceiling build up with cold void above

    It doesn’t feature in the vast majority of ceilings like this one, as there’s a quilt of insulation separating the room from the cold loft space. But if you want to go belts and braces and a different detail involving one, that’s also fine if you get it right…
  13. 2

    Kitchen sink drain knackered

    When I do these I use a solly weld branch with an access plug on it where it comes out the wall for access to unblock rather than just a bend, possibly overkill but it’s what I do…
  14. 2

    Kitchen sink drain knackered

    No just undo it from the trap. Turn the nut clockwise as you look at it from the cupboard, the pipe then pulls out. Then you put the washer and nut on new piece when you feed it in through the wall
  15. 2

    Foundation & Wall design check

    I don’t think the cavity insulation would be celotex? Normally you’d have dritherm mineral wool batts full fill, or if using PIR you need interlocking boards and a clear gap between insulation and masonry. Also I’d carry the dritherm down to the lean fill sloped bit, and not have a cavity...