Recent content by ap0115

  1. A

    Open Vent pipe layout question

    Interesting. I'm thinking that the usual "combined" arrangement is when the original 15mm feed is scrapped and the 22m vent is repurposed to be a single 22mm feed from the tank down. In the above, the F & V drop two floors together, are then combined and finally T'd into the flow 22mm later ...
  2. A

    Open Vent pipe layout question

    Open-vent 4-port boiler was recently changed for a new 2-port model. The diagram shows the connections to the FE tank. The junctions are numbered to make it easy to refer to. Can anyone comment on the layout?
  3. A

    Bath / Shower mixer strip down

    Thanks for getting back. So I've attached some pictures, and added text to them. I reckon the spout will screw off, like yours, or it might just be a quarter-turn "bayonet" style attachment - like light bulbs. I may or may not have to take the taps off the base posts to do this. Depends on...
  4. A

    Bath / Shower mixer strip down

    Aaaaaaargh! But you didn't say HOW you did it! I have a similar style bath/shower mixer tap, different manufacturer. The diverter lever comes off, and you can see the plastic shuttle. It has an o-ring at the top which shuts off water to the shower when the shuttle is pushed up, and an o-ring...
  5. A

    Drayton stiff TRV - can't turn off completely

    OK, I had a new TRV-4 fitted this summer, and as the heating only came on recently, I now realise it is VERY stiff to turn. I've taken the head off. The pin springs up and down without problem. The head by itself will turn freely from 6 to *. But replace the head and it will only turn freely...
Back
Top