Trying to cross the "t"s etc. before having the EV charger installed. As is always the case there are some spanners to get rid of:D.
The existing CU is remote from the meter, 7m tails with a 100A sub main switch at the meter end. TT earth with an unprotected 2.5mm cable coming out of the wall...