Recent content by Andrew Lyons

  1. A

    Loft Conversion Steelwork

    It will sit just above floor level but will take the load of the existing purlin as there will be a 2m wide dormer mid-span which basically cuts through the existing purlin and the existing props are being removed too. The front face of the new dormer sits over the new purlin beam.
  2. A

    Loft Conversion Steelwork

    Hi, The Purlin beams also take the floor loading with the joists running perpendicular to the ridge. The joist are 194x47 and are within the span tables I have found. I am not questioning whether they meet the actual structural requirements but more concerned about living with it and any...
  3. A

    Loft Conversion Steelwork

    Hi, Has anyone got any experience in relation to sizing steelwork for a loft conversion. I engaged a Structural Engineer to design the steelwork and timbers form my loft conversion. He has come back specifying a 152x152 23 Universal Column for ridge and purlin beams. The maximum clear span is...