Recent content by annemarie

  1. A

    partp- consumer unit change

    Well, very interesting shower conversation. Just to clarify we don't know when the electric shower was installed but it was before we moved into the house April 07. It stopped working in May 08 and it still hasn't been changed because we have discovered that our new consumer unit was installed...
  2. A

    partp- consumer unit change

    To be fair the new kitchen ring is only for fridge/freezer, dishwasher and toaster/kettle, food mixer. The washer (and future dryer) are in a seperate room. I think the 20A is probably OK. I will give a progress update.
  3. A

    partp- consumer unit change

    The electrician we may get to do the remedial works also told me that a pull cord may not be necessary. But the building control electrical inspection has said that it is NECESSARY and that the new consumer unit can not be signed off until it is done. Hopefully the electrician we get to do...
  4. A

    partp- consumer unit change

    Last query- it seems that the building control electrician has commented that the 20A fuse for the new kitchen cicruit is too low. Is that right? Will it be a lot of hassle to change it?
  5. A

    partp- consumer unit change

    Actually, Jason- about the shower pull cord. This whole thing first came up because we need a new shower. Doesn't the shower need a pull cord in the bathroom? Is it enough just to have a switch beside the consumer unit- down two flights of stairs?
  6. A

    partp- consumer unit change

    I guess the issue is ours has been picked up and tested and all is well. But not clear that other customers will be informed.
  7. A

    partp- consumer unit change

    Thanks Jason On the remedial works bit the electrician didn't mention anything about getting the old kitchen circuit covered by RCD- should he? The building control electricians did a periodic inspection and testing- will they have done the live and dead testing that is necessary...
  8. A

    partp- consumer unit change

    Well, building control came our 2 weeks ago and one of their electricians arived the next day. They figured out which circuit was which on the consumer unit. The electrician seemed to have made up the fuses he used in the kitchen.... the new kitcken ring was documented on the kewtech...
  9. A

    partp- consumer unit change

    Getting somewhere slowly! The charging twice was just to illustrate that I was told by C and O that every electrician charged about £100 for Part P work as a flat charge so it was to our advantage to get them to do all the work, rather than have some of it done in advance but it looks as if...
  10. A

    partp- consumer unit change

    You'll note they also refer multiple times to the 'fuse box' rather than CU. Even I have picked up that lingo now:)
  11. A

    partp- consumer unit change

    No the answer didn't really help:) I'm pursuing a civil claim whilst waiting to hear if they are doing criminal one. The details of errors in quotes to me are small fry in all of this.
  12. A

    partp- consumer unit change

    But the pre-installation visit was not from a qualifed electrician! He did not notice that the existing CU did not have enough space for new circuits. Anyway. We have been ripped of whatever way you look at it. I'm just trying to work out if the quote is nonsense too and we could reasonably...
  13. A

    partp- consumer unit change

    Quote came from Core and Ore 'pre-installation visit' - and from someone who is not a qualified electrician, which may be why he fails to notice that new CUs are needed. But the Part P/bonding quote seems to be standard with them.
  14. A

    partp- consumer unit change

    So £140 seems a lot for a Part P cert then. I remember at the time of the quote we mentioned that since we knew the CU would have to be moved we had considered getting it done in advance but they said we would then incur 2 seperate Part P charges - one from first electrician and another from...
  15. A

    partp- consumer unit change

    Uhm..... but is it normal to charge for Part P certification per se? I thought that if the electrician was able to self-certify then there should be no additional charge for certification as it is an obligation after doing the work. I can understand that if building control were to be involved...
Back
Top