    Calling fellow sparks

    I haven't done many agricultural installations before so does this set up seem ok? The building is steel framed with a water supply Pig sty/weighing room is fed from separate building 50mtrs away which has a PME head. The plan is to have a switch fuse feeding an two core swa, then an...
  2. B

    electric shower off lights

    is this wrong then? because it keeps tripping out thefuse thingy when i turn it on!?
  3. B

    electric shower off lights

    i have bought a 8.5kw electric shower and it is not very easy to take the cable to the fuse board is it it ok to spur of a live feed in the loft from the lighting circuits via a brown junction box from B and Q as i dont want to takeup florr boards. please reply asap +++++++++++++++++++...