Me again!
Just trying to work things out in my head.
I reckon the following:
I have 100mm from the stair line to the top of the existing Newel stump.
I need 900mm from the stair line to the top of the handrail attached to the complete newel.
If i get a 910mm Newel (not including the...
Thanks.
Just a few more details.
Drawing a line from the top of the string down across the newel and then marking the centre spot, gives me 85mm to the top of the uncapped post.
I'm trying to work out, if
a: i have enough depth with 85mm to drill the hole required to host the new newel...
Hi,
New to the forum so be kind! :)
I'm looking to re-instate the Bannister/spindles etc on my property, but i have the following problem. The previous owner has cut the original Lower Newel Post, and i believe it now does not have enough clearance above the where the string is secured onto...