As mentioned in the first post, I plan to only work on my own private pipe, this is the one pictured on the bottom. I have no interest in modifying the public manhole.
I’ve attached a photo. The top square chamber is the existing brick manhole.
The lower muddy hole with water is where I excavated down through clay soil. After removing the clay, I hit solid concrete, and my pipe runs underneath it.
My questions are:
- What is the correct way to create a new...