Recent content by Boney25

  1. Boney25

    6.5m Goal post RSJ

    They had considered one internal wall which is directly in line with the goal post when calculating the wind load. Which reduced the load by 23%. Should they have been able to take benefit from the other walls which are parallel to the beam too? This is the connection design:
  2. Boney25

    6.5m Goal post RSJ

    Thanks very much for the input. I challenged the SEs, to which they replied: "I understand the big beam queries; this is quite an unusual section we use. We were surprised, as you were, but we have a big house here with the load area not only from the main house but also a big wind area to...
  3. Boney25

    6.5m Goal post RSJ

    I feel like it is unnecessarily large too. Do you have an example of the joint used to achieve the stiffness please? I want to go back to the SE with a suggestion as they didn’t seem overly excited about changing the design when I first challenged it.
  4. Boney25

    6.5m Goal post RSJ

    I did challenge the SE about the size of the beam as it is enormous! Their response was: "The reason for such a big beam here is the fact that we have a goal-post frame here to provide proper global stability of the building. The beam section is so big to have a stiff connection between the beam...
  5. Boney25

    6.5m Goal post RSJ

    Hi All, I'm planning on opening up the rear of my house and could do with a little advice; I'm exhausting the internet and youtube. The Structural Engineer has specified a 305x305x118 6.5m long beam bolted to the sides of two 203x203x46 columns (B6, C1 LHS and C1 RHS). The columns are to...