Just about to put the ridge tiles on the roof and have a question. How much gap between ridge tiles and how do you stop the cement from falling down the gap between the curve of the ridge tiles. ( tiles are marley modern)
Thanks
Hi trying to put Marley Modern interlocking smooth tiles on a 15 degree pitch roof. The problem is the first course of tiles needs one batern (25 x 50 ) but then the next need two and the third row needs 3 batons. to keep the tiles level ( not kicking up) What am i doing wrong ?
thanks