2 basins back to back, 2 separate bathrooms. studwall between rooms
Stack is about 2.5metres away. which would be best and meet building regs?
option 1: run 2 separate 40mm pipes to stack.
option 2: connect into horizontal soil pipe (Top of soil pipe with a boss) from each sink, about 1m...
All of the gable extensions I've seen that join a hipped roof, are either the same pitch as the hip so on the end there would be no need for ridge tiles. Or the gable extension is set in from the end of the wall, so the lead valley does not interfere with the first ridge tile on the hip rafter...
Hi
Wanting to build a ground floor extension with a gable roof approx 25 degrees joining a hip roof approx 40 degrees . This gable will start at the end of the bungalow and finish about half way along, this part is straight forward was wondering how the valley board and lead from gable roof...