I am a professional bathroom fitter and do this all week every week. The feedback I get on checkatrade and continued work load says it all.
It will take longer than 5 days even with separate trade for each job lined up ready to go for a start. It takes me 10-15 days to complete an average...
I am currently on a refit and have a problem with existing soil pipe. I have taken out the 95d bend which was in concrete to found the soil pipe to be 125mm pot. I need a 125mm to 110mm reducer so I can reconnect to new bend and boss. any ideas would be welcome.