Hi All.
I'm a DIYer building a single storey rear extension on my 1960s detached house. Roughly 4 metres by 9 metres.
My foundations have been poured, but despite oiling all the shuttering boards up, about 30% are stuck fast. The boards are mainly where the foundations cross the sewer trench...