    Workshop/office power, prep for later years

    Thank you both for your replies, that's helped a lot! Looks like my plans of future proofing were flawed! Youre right though, the runs would need to be between joists (and through one) and down the walls, can't imagine I could get a shallow bend at either end and a 50mm hole in the joist in...
  2. D

    Workshop/office power, prep for later years

    Hi all, Im a recent home owner, and have a long term plan to build a building at the back of the garden (about 20 meters long garden). Consumer unit is at front of house and an awkward position so routing the armoured cable will be almost impossible once everything is decorated. The workshop...