Recent content by dane606

  1. D

    New boiler was chem flushed at installers recommendation

    :D we're adding underfloor heating later this year to an extension - I agree its a bit overkill though, but wasn't my choice - just advised!
  2. D

    New boiler was chem flushed at installers recommendation

    Hi Tony - its 15.6 with all range burners on (happens every other sunday). Yep the range was already there, I don't know what the meter pressure was at that point, I don't think they took it. We had the pipes redone when we fitted the cooker a few years ago, but that was a small boiler (24cDi).
  3. D

    New boiler was chem flushed at installers recommendation

    Hi there 3 weeks ago had a boiler installed - the enigineer said they didn't recommend a power flush. The DHW wen't last week, we've had the manufacturer service team out who said the heat exchanger needs replacing as is full of green water and gunk, causing the boiler to lock out. The...
  4. D

    Cement render to dry before plaster

    Thanks steve - I should think he will - do you think he'll get away with same day skim? Or should I push for 2 seperate days?
  5. D

    Cement render to dry before plaster

    It is a wall we dried out due to damp - reads 0 now - dry as a bone so should suck plenty of moisture out of the render - which plasterer reckons is best as sand cement due to the previous damp
  6. D

    Cement render to dry before plaster

    Hi there - I've got tradesman wanting a day rate on a plastering job that involves a sand/cement render on a couple of 2 m sq areas of brickwork to be plastered on top (including the whole 20m sq wall). He's not too keen to quote for the job rather than day rate and reckons the render will be...