Really well, I pulled out 3in posts and dug a little deeper and put 4in in, 3 bags of postcrete each and finished.
Even the section between the houses that I could only dig down 300mm but wedged in with postcrete
Just finished a 7x3m decking too
Wish I could but there is a gas pipe under there somewhere.
I have ripped out the 3x3s. 1 snapped at the concrete top 1 was cracking, doest fill me with much hope for the 4 x 4s. As they're incised
Cheers Martin,
In process of ripping out now ordered 4in posts and 2 bags of postcrete per post.
I have this section about 7mtrs the gap is 4in wide 2 solid paths between 2 houses. What's your thoughts on this.
I was thinking dig down 4-500 deep and perhaps 8in either side and sandwich...
Mine, its a council house. I'm a joiner but wanted to challenge myself before ever doing one fir a customer
I'm trying to think if it fails, why, how and can I overcome it to make or right?
Planning on 1800. So in theory should have been 600.
I also think the 3 x 3 was a big mistake. Can't say for certain if I got the holes 230 wide as some suggest, and even coverage round all 4 sides as the posts were close to the chainlink fence.
Each post had a full bag of Crete though
Hi all,
I'm in the process of fitting my first ever fencing and tbh I'm having a mare and now I'm worried I may need to rip out where I am and restart.
Basically I'm self employed and whilst off I started the fence 36m or so around 3 sides
1 side and along back. I've been able to bolt my...