With regards to testing and signing off the extension, would the tester have to test the circuits added to(ground floor lighting and ground floor sockets, or the whole c.u? And how much wouldn this cost?
hi
Is it acceptable to break into an existing ring main and lighting circuit to feed a new extension to a dining room? the extension will have 2 double sockets and two downlights. Also is a smoke detector required in this? The consumer unit is split with half the circuits covered by a rcd.
Hi i have been asked to install a new shower supply cable for a 8.5kw shower. The cable run is approx 15 metres long with about 3 metres through a cupboard with a boiler in it and 8 metres through a loft. The cable will be clipped directly to joists by itself and avoids all insulation or going...
Over the last few months a black mould has appeared on the ceiling in the bedroom. I have been into the loft to inspect above the ceiling and found no leaks or dampness. It now appears to be spreading across the whole length of the ceiling but only on one side of the room where there is a...