Weep holes, plastic/copper pipe, at the bottom, into a layer of open structured hardcore/gravel approx 1 metre spacing, fabric over ends stops them clogging.
Advised to tank wall above weep hole level with plastic sheet.
If youre flagging the top of this new area rather than grass then most of...