Assuming it’s installed ref method
Assuming it’s installed ref method A, are we looking at 10mm TE with 42amp Fuse, using a 32mm breaker in the kitchen or splitting them into discrete radials (this seems a bit excessive). Note I’m not installing this (it’s part P). Just planning my kitchen and...
That’s great thanks. I’ll change the oven radial to standard 45amp iso switch to control them both. Had t accounted for the fact 6mm could take >45amps.
Hi all,
First time poster. I’m currently designing a new kitchen and am trying to work out a logical electrical plan.
There is currently a ring main (2.5mm TE) and a radial (2.5mm TE) both RBD protected from the MCU supplying the kitchen. The combo boiler has already been moved onto its own...