DP's latest activity

  • D
    DP reacted to ronniecabers's post in the thread Mirror with Thanks Thanks.
    If you are after polished edges ( which looking at the location I'd be surprised if you aren't) , then yes 2 weeks is about standard...
  • D
    DP reacted to Wayners's post in the thread Mirror with Thanks Thanks.
    Find local glass supplier. They can cut to required size quickly.
  • D
    DP posted the thread Mirror in Windows and Doors.
    I am looking for a mirror 1.2m by 0.9m that is to be splashack at the bathroom basin. Downtime quoted is a few weeks. I have made a...
Back
Top