Recent content by dunloadin

  1. D

    What's up with our electric?

    What you have there is a BGlobal smart meter, ignore the Npower label. The meters are programmed by modem and can have any tariff sent down to them, so you wont have any clocks or teleswitches attached to it. There may be a contactor (single or poly) wired in to switch the load on to any...
  2. D

    economy 7 meter wiring

    Just had a look at the picture....what you have there is a 4-terminal multi-rate meter. It gives normal/low reads as per E7, but only has one live out...hence the consumer unit tails being put into blocks. So, at the moment your storage heaters are energised 24/7!! What you need is to get...
  3. D

    Installing Electric heating system

    Regards metering. If your in Stirlingshire your sorted...assuming your on the Scottish Hydro DNO area the metering you require is Total Heating Total Control. If your DNO is Scottish Power then you will need Comfort Plus. These are two-meter systems; Meter1 is a bog standard single...